Overview:
we carry out maintenance for our client in their Bristol based distribution centre. We were asked to design and install a partition to section their warehouse. We designed the partition in line with building and fire regulations. This comprised of a jumbo stud system, mineral wool infill, plasterboard and fire board, and sealants around the structural steel work. The boards were taped, jointed, and decorated.
|
Services provided:
|
![](https://www.gentip-services.co.uk/content/uploads/2023/02/6.jpg)
![](https://www.gentip-services.co.uk/content/uploads/2023/02/5.jpg)
![](https://www.gentip-services.co.uk/content/uploads/2023/02/4.jpg)
![](https://www.gentip-services.co.uk/content/uploads/2023/02/3.jpg)
![](https://www.gentip-services.co.uk/content/uploads/2023/02/2.jpg)
![](https://www.gentip-services.co.uk/content/uploads/2023/02/1.jpg)
![](https://www.gentip-services.co.uk/content/uploads/2023/02/6.jpg)
![](https://www.gentip-services.co.uk/content/uploads/2023/02/5.jpg)
![](https://www.gentip-services.co.uk/content/uploads/2023/02/4.jpg)
![](https://www.gentip-services.co.uk/content/uploads/2023/02/3.jpg)
![](https://www.gentip-services.co.uk/content/uploads/2023/02/2.jpg)
![](https://www.gentip-services.co.uk/content/uploads/2023/02/1.jpg)
Summary
The project went to plan and fulfilled our client’s brief. All finished to a brilliant standard and met all the required regulations
Client’s statement
Another great job from Damien and the team at Gentip. Was just what we needed!